From site findings to a signed fitness-for-service report

ATS uses this system to turn site inspection findings into a factual inspection report, then into fitness-for-service assessments of pressure vessels, columns, heat exchangers, storage tanks, piping and structural steel. Each step is reviewed and signed off by qualified engineers.

Equipment assessed A horizontal pressure vessel with a corroded area mapped by an ultrasonic thickness grid, and below it a storage tank, a shell-and-tube heat exchanger and a steel beam section with a gouge. s c UT grid, tmm pressure vessels, columns, piping remaining strength RSF compared with RSFa Storage tanks Heat exchangers Structural steel
Damage is measured on site, and each item is assessed on its remaining, measured condition.

About ATS

ATS is an established inspection company based in Kuwait, serving the Oil, Gas and Petrochemical industries. Our qualified and experienced inspection engineers deliver testing and inspection services to the highest professional standards.

What it covers

Each calculation records the standard, clause and equation it uses, together with the inputs as entered, so every result in a report can be traced and checked.

Pressure equipment and storage tanks

API 579-1 / ASME FFS-1 — pressure vessels, columns, heat exchangers, storage tanks and piping

  • General metal loss (Part 4), Level 1 and Level 2
  • Local thin areas (Part 5), Level 1
  • Pitting corrosion (Part 6), Level 1
  • Hydrogen-induced cracking and blisters (Part 7), Level 1

Structural steel

AISC 360-22 — beams, columns, braces and connections

  • Tension (Chapter D) and compression (Chapter E)
  • Flexure about the major and minor axes (Chapter F)
  • Combined forces (Chapter H) and block shear (Chapter J)
  • Retained capacity of damaged members compared with the intact section

Crack-like flaws (API 579 Part 9) and dents (Part 12) are assessed by our engineers outside this system.

Site inspection on its own, up to a formal Site Inspection Report, is also offered as a separate service.

How the calculations are checked

Every calculation in this system is verified against the standard’s own published worked examples (API 579-2). Each report is then reviewed and signed off by a qualified engineer, and the sign-off is dated.

How a job runs

The client approves the factual record before any assessment starts, and the approved record carries through to the final report without being retyped.

Enquiry

Scope, access and the standard site forms.

Site inspection

Findings, measurements, test results and photos recorded. The factual inspection report is approved by the client.

FFS calculations

Each component at Level 1, and at Level 2 where needed.

Engineer review

Results checked, and the report signed and dated by named engineers.

Report issued

The signed report is delivered to the client.

Completion certificate

The client's acceptance closes the job. Data and reports are returned and erased; the certificate stays on public view.

Built for accountable engineering

Engineers make the decisions

The software calculates and assembles. Dispositions, conclusions and sign-off are made by named engineers, and nothing is marked approved automatically.

Traceable from site to report

Every component in an assessment report cites the inspection item it came from, with the photographs and measurements recorded on site.

Client data stays controlled

Access is by individual account only. AI assistance is off by default and is used only where the client has given written consent, which is recorded.

Missing data is shown, not filled in

Where a measurement was not recorded, the report says so and states the assumption made, instead of inventing a value.

RBI Assurance

Helps asset owners reduce the risk of catastrophic equipment failure by exposing gaps in integrity evidence and tracking corrective actions through to closure.

Our short guide explains what RBI Assurance is, when to apply it, and how it supports an asset integrity programme. Anyone can read it — no sign-in needed.

Read the guide (PDF)

Access is by invitation

If you would like to discuss an assessment or use the system for your facility, send us a short message and we will reply by e-mail.

Request access